Push out an 9-year Alibaba Cloud
In the future, in September 1st, 2033 at 11:59 pm, this instance will expire in Ulan Bator (North China). The system is Debian 10 and the instance is ECS T6-C4M1 Large. The CPU core number is 2 and the memory size is 512 MiB. The HDD size is 1G. This instance is configured with the following specifications: ecs.t6-c4m1.large. The performance of this instance can be found here: https://help.aliyun.com/zh/ecs/user-guide/burst-performance-instance-overview?spm=a2c4g.11186623.0.i4.
页:
[1]